Last week (August 22-28, 2021) was a stop-and-go affair for the project. As I mentioned in my last post, Tropical Storm Henri hit us with wind and rain Sunday-Monday, so progress on work was delayed until Tuesday the 24th.
At that point, things went fast as you’ll see below – until Friday. There was a crack three-man crew of Raphael (supervisor), yet another Raphael, and Enrique who arrived and worked like men possessed. This despite that the weather was really hot all three days – mid-90 degrees Fahrenheit (32 to 36 Celsius for you metric folks). There is really no shade either in our yard.
Putting on the sill and building the first garage wall.
Walls went up quicklyThe two Raphaels mug for the camera after getting up the first LVL beam. On the left is the supervising Raphael.Another view of the beam going up showing the ZIP system sheathing and tape. Soon, three garage walls were framed and sheathed. Here you see Raphael in front, Raphael in the middle, and Enrique in the back.Bracing was set, and then the first of the second-story floor joists was installed on top of the garage walls.More floor joists were to follow.At the end of Tuesday the 24th, this was the hard-won progress. Again, it was HOT.On Wednesday the 25th, work began early on the second floor flooring.We also got a delivery of more lumber…and a porta-potty!Work started on the second floor gables and walls.Raphael handles a sheet of sheathing with ease.
Looking at the back of the garage
Looking out the front
The garage interior at least now provides some shade!View from the street as the first gabled wall goes up.Closer shot of the first second floor gabled wall. There is going to be a pretty tall ceiling in that room.The hot sun sets, revealing Wednesday the 25th’s progress.
More second floor walls up
Good view of the side where the deck will be
Thursday morning more progress on the second floor was made.The deck side wall went up plus the strong LVL beam that will go over the glass doors. Again, did I mention it was HOT? AGAIN?Close up view of the second floor deck/door side.Raphael strikes a pose as the rafters take shape! The man has some guns!
At the end of the day, here below was the progress for the week – on Thursday.
Progress at the end of August 26th.
Friday the project got held up as we needed to get the deck piers excavated – and the excavator did not make it to the site. Also, the pre-fabricated concrete deck piers would need to be moved to the other side of the building, and they weigh about 600 lbs. each. Ironically, the heat broke Thursday night and Friday was nice and in the 70’s. But it is August, so….the heat will be back, even in September. Of course it could snow in October…
I’m looking forward to more progress coming during the week of August 29th to September 4th. Stay tuned!
Has it been 5 weeks already? Still, we are indeed anxious to get this building up!!
Ready Installs and Cormier Homebuilding were busy this week. We also had Mike Astrella and his crew doing some electrical work. Moving forward for sure.
Backfilling the foundationMore sand for backfillingMike Astrella working on conduitsDrilling out hole for septic accessBackfilling progress – and repair on foundation chip.Concrete piers for the deck came on Wednesday. Deliveries would start to accelerate.Close up view of chip repair. Looks good!Wednesday progress.By Wednesday, this was the view of the progress from upstairs in the house.
Friday and Saturday would see more deliveries. Some lumber is still on back-order, but not too much.
Friday saw a delivery of lumber – mostly LVL’s and floor joists.Saturday saw a BIG delivery of even more lumber.Lots of lumber!End of week – here we are progress-wise.
With any luck, Tropical Storm Henri (which hit us Sunday with rain and wind and will affect us through Monday) will not cause any delays this week.
Hope you are enjoying these posts – and this journey.
Yes! It’s finally time for the FINAL REVEAL of my Aztec cityscape. It’s been a labor of love – to recreate this tabletop for gaming. What game you ask? Why of course – Buck Surdu’s Feudal Patrol™! I wrote the gaming supplement for Feudal Patrol™ games during the period of the Spanish Conquest. The supplement involves the Conquistadores, the Aztecs, the Tlaxcalans (and more Mesoamericans who fought the Aztecs), the Maya, and the Inca (in South America). I called it Civilizations Collide, and it’s a free download from Buck’s website or from Sally4th in the UK. If you have not checked this excellent game out – do it!
This is Part 5 of my series on “Building an Aztec Cityscape”. There are a lot of background history and WIP details in these posts that for brevity I won’t repeat here. However, if you have missed the other parts, they are listed below with their links:
Building an Aztec Cityscape – Part 5: Tenochtitlan – THE FINAL REVEAL (this post)
As for wargaming the period of the Spanish Conquest 500 years ago, I want to be clear. It was brutal to be sure, and as I have stated often, there were no good guys on any side. I did not aim to glorify any aspect of the time, but to raise awareness and knowledge of it through wargaming.
From the start of this project, I wanted to create a unique and hopefully stunning tabletop for these games. I had a vision of creating a nice cityscape – an encompassing panorama that I had not seen anyone else do at any convention. Also, the cityscape needed to facilitate a fun gaming experience, so visually, I felt that had to go big. I had already painted 230 figures for the period. I had built many buildings too. Therefore, I wanted something that had the “flavor” of Tenochtitlan. However, with the tabletop designed for 28mm skirmish figures, (about 1″ tall), building a true-to-life and historically accurate Tenochtitlan would have required a gymnasium-sized playing area. I have seen stunning photos from SALUTE in the UK that were for 15mm gaming, but that scale went far beyond what I envisioned – or what was feasible for me. For travel to gaming conventions, the cityscape needed to be able to be broken down and transported easily. It needed to be useful for multiple games. This post will reveal my solution, for better or for worse.
I started out with historical research into several sources, and thinking about what I wanted and what I could do. After I had my initial concept, I then refined it into the two plans that I put on paper below.
First rough draft of the plan.Then, I refined the plan.
The previous posts describe in more detail how I got here. So, let’s show some eye candy – and I will be posting on the Combat Patrol Facebook page and sharing a link to my IGTV page where you can view a video of the cityscape.
Here I set up some figures on the cityscape – many of these images were shown in previous posts – but here you get to see the whole thing!
Ta daa! Click on the images for a bigger view.End view – the mat is from FLG.Opposite lengthwise viewAngled view from the end.
As before, this is DEFINITELY (I think anyways) my last entry into Dave’s Season of Scenery Challenge! Thanks Dave for running the challenge and letting me be part of it. At least it’s the last part of the cityscape posts.
I also want to especially thank my wife for tolerating this bit of my madness. And of course I thank my old West Point comrades Buck Surdu and Dave Wood, Greg Priebe, Chris Palmer and the HAWKS, Chris Abbey at Sally4th, Dave at The Imperfect Modeler (especially for the chinchilla dust tip), GED at Gringo 40’s, IRO (for inspiration), Joerg Bender at Things From The Basement, the Uxbridge Historical Gaming Club and the Mass Pikemen Gaming Club.
A SPECIAL THANKS TO ALL the bloggers listed below who have taken the time to encourage me over this project. I am indebted to you all – you kept me focused, and motivated.
I’m not an award-winning videographer – but I hope that you enjoy the video.
What’s next? I will be going to my first HISTORICON and bringing both my cityscape and my rural tabletop. I will also be adding the two naval types (brigantines and war canoes) to the next version of my Civilizations Collide supplement – along with new scenarios and scenario-specific rules. I hope that you will like these. Yes, I have more work to do!
Please let me know your thoughts in the comments section – and thanks for looking!
For all of my previous posts on games, units, and other projects for my 16th Century Spanish Conquest supplement for Feudal Patrol™ – “Civilizations Collide” – please see this page.
The fourth week of the project (through August 14th) saw some progress, as well as some headaches. I’ll let the pictures below help to tell the story.
View from the house
Looking from my normal parking spot on the driveway
This is where the project was early morning Monday, August 10th. By Tuesday, August 10th, we started to see some dirt moving.
On Monday, serious work began on moving dirt. More of the old driveway was removed, as was some overburden. Unfortunately, on the previous week, one of the less-experienced excavator operators hit the new foundation and chipped off a piece.
AAARGH!
That was not pleasant to learn or see. It’s repairable, but felt awful as it’s brand new. As this week was about digging a trench for the water line and a second trench for the power and coax cables – and would require digging close to our house foundation – the owner of the company doing the subcontractor work for the excavation (Andy Cormier), took charge of the digging. That was a relief as having an excavator hit the house would have been a nightmare.
This is Tuesday, August 11th. Andy is digging the electrical/cox cable trench. More of the old driveway was removed and some cracked as you see here to the left of the open cellar bulkhead. It will all be repaved anyways.
While Andy digs, Frank drills a hole in the foundation for the electrical & coax conduits. You can see the “ding” on the foundation’s car door above his head on the photo on the right.The electrical/coax trench being dug.Setting up a form to repair the chipped edge.
Here the water line trench is started (separate and distant from the other electrical/coax conduit trench for obvious reasons).Electricians work on the conduits in the foundation. My wife Lynn is inspecting above!Long view of the trenches – looking very WWI in the back yard…At the end of Wednesday, August 11th, the water line was in and its trench was backfilled. The electrical and coax cable conduits were inside the foundation and ready for backfill there too.
At this point, it became a waiting game for the wiring inspector, as both the conduits in the remaining trench, and in the foundation, needed to be inspected before being backfilled. We lost time as he did not come until Friday morning. As Andy was not sure as to when he would come, he had moved his excavator to another job site. This would delay the backfilling. Also, the wiring inspector wanted thicker conduit installed where it attached to the house (schedule 80 versus schedule 40), in case it was struck buy something. He also wanted more sealing where it went through the siding. Therefore the electricians had another task for the following week’s work.
The end of the electrical/coax cable trench by the house on Friday.
While construction was on hold, Saturday was a big day as it involved Massachusetts having a “tax-free weekend”. This is when – as a “gift” from the legislature – businesses can sell items up to $2,500 with none of the 6.25% Massachusetts sales tax applied. While I wish that we had been allowed to start this whole project a couple of months sooner, this was a boon. I am purchasing all of the project materials so as to get the points on my credit card. This requires some degree of management on my part. I had spent the week working with Ready Installs and their vendors to line up as much as I could get to be ordered on that weekend. A few items (mainly big doors) did not qualify, but a lot did. One of the biggest orders would be from The Home Depot store in Shrewsbury, which is about 45 minutes away. I also knew that there would be a LOT of people and contractors thinking similarly about the tax-free weekend. So, I got up before 4 AM, got myself ready, and was the first in line before the Home Depot opened at 6 AM on Saturday. No worries as getting up early is my norm. I got the order – and all the other orders in – and saved a substantial amount of money overall.
Yes, I am awake…hell, the sun’s almost up even…The project at the end of the week. The next week will hopefully show more progress!
That’s Week Four, ending August 14th (for those non-US folks – our calendars end on Saturday). Looking forward to more progress in Week 5.
Thanks for looking! FYI – for those of you also following my Aztec project – the BIG REVEAL is coming very soon! If you are not, you should take a look here at the first installment – there are four now and one more to go.
War wagons were wooden carts for deploying missile troops. They had slits in them for crossbowmen and arquebusiers to be able to fire from while having some protection against enemy missile weapons. I think of them as wooden APC’s (WPC’s maybe?). Hernan Cortes used them as he was besieged in Tenochtitlan in 1520 – yes – over 500 years ago now.
This is Part 4 of my series on “Building an Aztec Cityscape”. The war wagons were so integral to the events in 1520 that I needed to have some as part of my cityscape. If you have missed the other parts, they are:
The first use of a war wagon in medieval Europe is ascribed to the Hussites during the Hussite Wars (1420-1434) in Bohemia. They were horse-drawn and would be linked together like a mobile fort.
Nearly 100 years later, Cortes would build some similar ones. These would be constructed as a measure of desperation to escape the Aztec capital. Cortes’ war wagons were thrown together during the time when they were besieged by the Aztecs in Tenochtitlan.
I need to give you a condensed chronological synopsis – the history of this time is quite full of twist, turns, and intrigue. The timeline is confusing but important for context. Therefore, listed here below is a condensed chronology with respect to the use of war wagons and a couple of possible wargame scenarios that I am working to build:
November 18, 1518 – Cortes departs the Spanish colony of Santiago de Cuba with his expedition – before he could be detained by Lieutenant Governor Velazquez (who had originally commissioned his expedition). Cortes leaves abruptly so that the Governor (who had justifiable suspicions about Cortes and his motives) could not relieve and replace him prior to his departure.
February 1o, 1519 – After fitting out in Trinidad and San Cristobal de la Habana, Cortes sails for Mexico.
March 22, 1519- Cortes arrives in Mesoamerica. He will fight and win several battles with both the Maya and the Tlaxcalans up until later in 1519. By that time, his victories will have given him a few key assets. One of these, from the Maya, was a slave girl named Malintzin aka La Malinche who was to serve Cortes as a key translator, and later, his mistress. The second was a post-conflict alliance secured with the Tlaxcalans, whose warriors would provide the bulk of Cortes’ forces.
November 1, 1519 – Cortes begins his march to Tenochtitlan to try to meet Montezuma II.
November 8, 1519 – Cortes arrives at Tenochtitlan and meets Montezuma II. He and his contingent are welcomed to the city and stay in it.
November 14, 1519 – through a ruse, Cortes successfully seizes Montezuma II and makes of him a puppet/hostage.
March 5, 1520 – Meanwhile, back in Cuba, Lieutenant Governor Velazquez sends an expedition led by Panfilo de Narvaez to intercept Cortes
April 19, 1520 – Narvaez and his troops arrive in Mexico. Cortes, with some of his Conquistadores, leaves Tenochtitlan to deal with this internecine threat. He leaves behind a trusted lieutenant, Pedro de Alvarado, in charge of the remaining Spanish/Tlaxcalan forces in Tenochtitlan.
May 16, 1520 – The Aztec nobility and elite troops in Tenochtitlan celebrate the Festival of Toxcatl. It is a large assembly of all the elite and elite military of the city, who are unarmed and dancing in a city square or plaza. Alvarado, afraid that the celebration is a prelude to an attempted massacre on them, seals off the plaza where the dancing/celebration is taking place. His Conquistadores methodically move through the throng and murder or capture every possible Aztec. One of the captured elites is Cuitlahuac, Montezuma II’s brother.
May 29, 1520 – Back on the coast, Cortes defeats Narvaez (despite being outnumbered by Narvaez by 2:1). He incorporates Narvaez’ surrendered troops into his forces and returns with them to Tenochtitlan on June 24th . (This Conquistador-on-Conquistador fight would be a good possible scenario for a wargame (using my Civilizations Collide supplement to Buck Surdu’s Feudal Patrol™rules).
June 2, 1520 – The Aztecs have been fully enraged since the festival massacre – and the situation is dire for the Conquistadores.
June 25, 1520 – In an attempt to mollify the Aztecs, Cortes releases Cuitlahuac. This was a rare strategic error. Immediately, Cuitlahuac, who rightly viewed his brother to be no more than a Spanish puppet, assumes Montezuma II’s powers and takes command of the siege of the Spanish as the new Aztec Emperor. The Spanish are besieged and are holed up in the Palace of Axayacatl. The Aztecs attempt to burn the Spanish out of the palace, but are repulsed by cannon and arquebus fire.
June 27, 1520 – Cortes forces Montezuma II to go to the roof of Palace of Axayacatl to plead with the Aztecs to stop the fighting. He is struck in the head by a rock from a sling and is gravely injured. At the same time, Cortes instructs his troops to scavenge wood from the Palace of Axayacatl and build several war wagons. His hope was that by using war wagons he could protect his own missile troops from the slings and arrows of the Aztecs – and make it easier for the Conquistadores to escape Tenochtitlan and survive.
June 28, 1520 – Cortes makes his first attempt with his war wagons to reach the causeways. He loads them with crossbowmen and arquebusiers, and supports them on the ground with sword and buckler men, and cannon (probably falconets and maybe lombards). Their movements are not powered by horses, but by the Spanish themselves. The Conquistadores fight bravely, but are pushed back. (This would be a possible scenario for a wargame on the cityscape with the war wagons).
June 29, 1520 – Cortes decides that the Temple of Yopico, a tall structure, was enabling the Aztecs to be able to hit his troops with enfilading missile fire from above. This is his second use of his war wagons, and he literally used them in a half-circle (yes, “circling the wagons”). He uses them similarly as before to help the Conquistadores to reach the Temple. This time they were tactically successful. However, the war wagons were to take so much damage that they are destroyed in the process. Cortes, beneath his personal banner, successfully leads his troops to ascend the 100 steps of the temple, killing many war priests and setting fire to the structure. But, the Conquistadores cannot hold the position against the Aztec numbers and are pushed back. (This – the assault on the Temple of Yopico – would be a second possible scenario for a wargame on the cityscape with the war wagons).
June 30, 1520 – Montezuma II either dies of his head wound, or is killed by the Conquistadores – accounts differ.
July 1, 2020 – La Noche Triste (the Night of Sorrows or the Sad Night) – the Spanish break out of Tenochtitlan at a high cost in lives, materiel, and looted treasure. (This – La Noche Triste – would be a possible scenario for a wargame on the cityscape and/or just the causeways with or without the war wagons).
Of course, then followed the Battle of Otumba, where Cortes used his cavalry to save his entire force against overwhelming odds. Eventually, he was able to regroup and with the help of brigantines, make a successful assault and conquer the city of Tenochtitlan. And yes, I have brigantines in the queue, along with war canoes. Plus I will be adding the two naval types (brigantines and war canoes) to the next version of myCivilizations Collide supplement – along with these two scenarios.
The only good image I can find of war wagon use comes from the cover of Sheppard, Si. (2018). Tenochtitlan: 1519-21. Oxford: Osprey Publishing, shown below. It is an excellent resource, and I do recommend it. There is a larger blow up of the same picture in the book – and you can see the war wagons in the lower right hand side at the base of the temple.
Enough background information (at least I hope). In looking for war wagons, I was challenged. I did consider scratch building some until I discovered these at Gringo 40’s in the UK in their 28mm Conquistador section.
Yes! I had found my solution! I ordered four from them, and the company was great. They even gave me a free Cortes figure (which I will paint soon I hope). Even better, these were solid METAL. Assembly was just adding the undercarriage axle supports, the wheels, and a wheel spacer. There are two benches inside and I can get two figures into the wagon. One challenge faced me that was new – no brush or angled brush would reach under the benches for painting. They do look nice though.
On the left is my 28mm Cortes figure, and the war wagons as received. The one with the figures in it is dry-fitted with the other pieces. While I have three figures in there, after painting them I’m now limiting that to two. A close angle of the same shot as above. The only brush access to the bench undersides was restrictive through this end.I gave the war wagons a spray prime – and then after a curing period, a brush prime – swirling a few cheap brushes like mops on the insides – getting as much primed as I could. This destroyed those brushes, but that was fine. Then I glued on the undercarriages and pressed them down.After the previous step, I attached the wheels and spacers/holders for the wheels, and reapplied primer which as you see here was needed.
I then used various browns (I list all my paints and more at the end of this post). to approximate a used wood tone. After all, these war wagons were made from old recycled lumber. At this point in the project, I still wondered how I was going to get paint etc. under the benches, as well as how I was going to varnish them. As you may imagine, these are heavy! I decided that they needed a “dip” – in some Army Painter dip. To retrieve them without a huge mess, I used a pot I bought from a Salvation Army Thrift store, some twine from the hardware store, and an old piece of balsa.
The war wagons in brown, and the pot, dip, and twine.How I was able to suspend the war wagons into the dip in the pot. I just had to restring each one after the dipping process.After the dip.
I needed to do more shading and some dry brushing after the dip, and then I spray varnished them outside (as I could for once).
Nice enough to varnish outside! Not common weather in New England year-round, but it’s summer.War wagons finished!
As this is the penultimate (love that word) post in the series, I will share some action shots below of the war wagons on the cityscape.
Battle in the Cityscape! Cortes tries to break out!Trying to escape Tenochtitlan with their lives – and their gold – the Conquistadores fight towards the causeways. Close up shot of a war wagon with an arquebusier and a crossbowman at the ready. The poor sword and buckler men get to push.
I think these will be very fun in a game. I just need to write rules specifically for their use.
The next post will be….(insert drumroll)…the FINAL REVEAL.
I hope to have a video link as well as pictures of the cityscape for you. These, because they are “vehicles” and were completed in July and August, all count as more of my entries into Dave’s Season of Scenery Challenge! Thanks so much for looking. I hope that you enjoyed the brief history and the war wagons themselves.
Please let me know your thoughts and ideas in the comments section! And the FINAL REVEAL is coming!!!
For all of my previous posts on games, units, and other projects for my 16th Century Spanish Conquest supplement for Feudal Patrol™ – “Civilizations Collide” – please see this page.
PAINTS, INKS, GLAZES, SHADES, WASHES, PIGMENTS, FLOCKING, GLUES AND MORE THAT I USED ON THESE TERRAIN PIECES/MODELS:
Not a lot happened this week on site construction-wise. We had visits from Ready Install‘s excavation, plumber, and electrician contractors. These were to determine what was needed to build and to coordinate activities. We did get a water line delivered and insulation for the foundation to protect against frost. Definitely was hoping for more progress, but hopefully next week will be better.
Insulation for foundationAnd a waterline.Jon Victor (on porch) helps measure for electrical work estimates.
Saturday was the highlight of the week – we went to Spotlight Design Center on Shrewsbury Street in Worcester and worked with Leanne Richard at Spotlight Design Center to finalize the design on the mini-kitchen that will be on the second floor. She was a true professional and extremely knowledgeable and helpful.
Spotlight Design Center in Worcester.Lynn and Leanne discuss cabinetry choices. I am letting those choices be all Lynn’s!
Leanne did a nice job with her CAD design for the kitchenette. She was very thorough.
Leanne working on the program. Remember, this is a 16′ x 24′ building!Adding lighting to the design.Final design. Looks great.
After this, it was off to Home Depot to look at some options for flooring and appliances.
I know Ready Installs is chomping at the bit, but again, I hope to see faster progress this week at the site.
The city of Tenochtitlan, the capital of the Aztec Empire, rose out of Lake Texcoco on an island. This island was connected to the mainland by a series of causeways. Reclaiming land from a water body usually involves building up a surface of large stones on its bottom. These would build up into a dry surface, and would usually be supported and protected by revetments. In the case of my Aztec cityscape, the pavements’ sides that I made of MDF had nothing on the edges (except paint) next to the waterline – and I thought that needed a bit of work.
Speaking of work and the pavements, if you are new to this 5-part series on my Aztec cityscape build, you can view the previous two parts by clicking on these links:
This post will cover the revetments that I made for the cityscape, as well as some HO scale lily pad and cattail bases that I added as eye candy (and possible obscuration of gaps and even MDF warpage). As before, I will similarly share my WIP photos as well as my lessons learned.
Readers of this blog know that I like a plan before building anything. I needed to figure out how many revetments to build – as I may or may not use all of my causeways or even my pavement tiles. Also, I had to figure out the sizes of inner corners versus outer corners (since they are differently sized up against the pavement tiles – so you just need to measure the side against the tiles).
My updated plan for building the cityscape.
I ended up following the same type of build and painting scheme as I did for the causeways – after all they had to match too aesthetically. As far as quantity, I ended up deciding to build 48 on 1/2″ strips of balsa. The breakout from the plan above came out to be:
6″ sections (10)
5″ sections (10)
4″ sections (10)
2″ sections (4)
1″ sections (2)
External 1″ x 1″ corners (8)
Internal 1″ x 1″ corners (4)
I made templates from 3′ x 5″ cards and used them to size and cut up some basswood (balsa like but stronger and denser) into the strips for gluing the rocks.
The basswood.Here you can see my templates, and the WIP. My inventory is building up in the top left.After I cut a few, I dry-fitted them around a couple of pavement tiles and compared them to the causeways as well for width. It looked good at this juncture to continue.
Once the bass wood pieces were all cut, the gluing began, similar to the process I used on the causeways. Each pebble had to be glued one at a time in 2-3 courses of different sizes – while letting each course dry before moving on to the next one. In terms of pebbles, I estimate that for the 184 linear inches that I put about 10-15 pebbles per inch. That means for the revetments alone I glued an estimated 1,840 – 2,760 pebbles/rocks!! Add in the six two-sided foot-long causeways, and that makes an estimated 4,720 – 7,080 pebbles that I glued down. Ok, now I know why these took so long!
Mid-project showing different levels of rock-laying completion. Here are 48 – including two more 6″ prototypes.Close up shot of progress later on in the project.
After all had dried, it was on to painting the two-tone colors, and adding slime and shade to the rocks.
After the two-tone priming.Completed revetments.
Next, I made some lily pads and cattails on some acrylic bases. These were HO scale from JTT Scenics that I got on Amazon. The link for the lily pads is here and the link for the cattails is here. I wanted to be able to further differentiate the lake and to have some verticality of structure along the waterline – such as you see in the picture below.
A painting of Cortes at the Battle of Tenochtitlan (from Britannica). Note the cattails.
I bought some 2″ clear acrylic bases years ago (2017), and had some in storage. I thought they would work well for the lily pads. They come with removable protective paper over them so that they had no scratches.
Acrylic base – there are many suppliers on Amazon. Here is where I got mine.The lily pads here are upside-down. The lily pads and their flowers are made on thin wire wound together – so if you cut the wire they all just fall apart. Initially, I used Gorilla Glue on the prototype, but decided to change course and fill the bottom of the wires and the holes with Vallejo “Transparent Water” Environmental Effect. Being careful not to overfill, this worked well and allowed me to cut the wires afterwards with no problems. I then used the water effect on the surface of the lily pads’ discs.The lily pads after the surfaces got the water treatment. They are still pretty clear, and will be good on either a water or a swamp mat.
The cattails bases were basically half-moons I cut away (removing the center hole) with my scroll saw. Then I drilled holes to put 4 in each base. I used the Vallejo “Transparent Water” Environmental Effect in a similar way as the lily pads, and after I cut the cattail wires I placed the excess on the base as cattails that had fallen over.
The product – I had 24 cattails that I put on 6 discs.
Cutting the discs
Randomly drilling the discs
Very clear acrylic even after drilling.
Making the cattail bases.Finished cattail bases.
Now, let’s see how they look on the gaming mat!
The revetments help fix the gap – here before…
…and after placement.
Revetment comparison.Pavement with revetments.Revetments, lily pads and the cattails on the mat.Extreme close up shot of the intersection of pavements, causeways, revetments, and cattails.
My goal with these was to create a visual distraction form the MDF edges. I think that they work fine – and of course you can let me know in the comments section if I am off-base (really, you can) or how you might have proceeded differently. Again, I tried meet the Aztec criteria of symmetry.
Thanks so much for looking – I hope it was helpful or at least interesting!
My next post will cover Cortes’ War Wagons that he employed with his troops in their breakout/ escape from Tenochtitlan during La Noche Triste.
For all of my previous posts on games, units, and other projects for my 16th Century Spanish Conquest supplement for Feudal Patrol™ – “Civilizations Collide” – please see this page.
PAINTS, INKS, GLAZES, SHADES, WASHES, PIGMENTS, FLOCKING, GLUES AND MORE THAT I USED ON THESE TERRAIN PIECES/MODELS:
Basswood (1/16″ x 3″ x 24″ pieces) (on revetments)
Ashland Decorative Filler (rocks) (on revetments)
Elmer’s PVA Glue (on revetments)
Vallejo “Surface Primer Grey” (on revetments)
Reaper MSP “Black Primer” (on revetments)
Citadel “Nuln Oil” (shade) (on revetments)
Vallejo Environment “Slime Green Dark” (on revetments)
JTT Scenery Products HO Scale Lily pads
Gorilla Glue
Clear 2″ Acrylic Bases with center holes
Vallejo Weathering Effects “Transparent Water” (on acrylic bases)
An Aztec cityscape gaming table would be incomplete without the use of proper pavements. Tenochtitlan was not built to look hardscrabble. These pavements would need to go under the massive buildings I had to represent the city of Tenochtitlan, the capital of the Aztec Empire. This post will cover the pavements I made for the cityscape. As I shared in my previous post, Building an Aztec Cityscape – Part 1: Causeways, Lifting Piers, and Removable Bridge Sections, I will similarly share my WIP photos as well as my lessons learned.
Many contemporary images of Tenochtitlan show a brilliantly white city. I am not convinced that this was its actual appearance. Much of the rock used would have been basaltic or limestone-like in quality. Both are subject to oxidation, and turn brownish-grey over time. That would be particularly true for pavements that were exposed daily to the intense rays of the sun. The painting below reinforced my decision not to go with a white/bleached appearance of stone structures for this project. I went more brownish/grayish.
A painting of Cortes at the Battle of Tenochtitlan (from Britannica). Note the brownish appearance of the masonry.
As with the causeways that I built, I used the MDF sheets I bought from Home Depot. They were 1/4″ thick sheets of 2′ by 4′ that Jeff Smith helped me to cut into ten 1’x 1′ and ten 6″ x 6″ sections. Then I laid them out to see if my initial layout concept would work. It did. But, unlike the causeways, I had an idea that the pavements should look weathered, and have some patterns sculpted onto them – Aztec patterns.
The initial plan
Jeff cutting the MDF
Dry-fitting the MDF on a swamp mat
A few months prior I had learned from a friend in Maryland (Greg Priebe) that he had a surplus Aztec Roller from Green Stuff World (see it here). I was deep into painting the figures that I had at that point – but I traded some Ral Partha Vikings to him for it – with some idea that I would use it when I got to the point of building a cityscape – somehow. (THANKS GREG!!)
I was not going to like just having the MDF just be painted, I wanted a more tactile, almost 3D effect on them.
However, we are talking about 15 square feet of surface! I considered using green stuff and Apoxie Sculpt (both too expensive and potentially difficult for a huge build like this). I considered using modeling clay and then baking it and passed as that would end up potentially with either MDF on fire or a cause for my wife to terminate my existence for using her stove or both. After perusing YouTube for some ideas on sculpting on the MDF, I found this video from a guy named Luke in the UK where he used DAS clay mixed with PVA glue to use with Green Stuff Rollers. I decided that I would give that approach a go. I bought this DAS in white at Michaels.
Before I started, I needed to test and practice with the roller itself. It has a rectangular pattern, but it is a roller. Therefore, I would need to know where to start and where to stop. The solution came in borrowing some of my granddaughter Tabitha’s Play-Doh and marking a start and stop point on the roller with a Sharpie (and then returning the Play-Doh of course). This also let me figure out how large the imprint would be.
The roller pattern on Play-Doh as a test pattern.
The next step was to figure out the marking/sculpting plan for each pavement. I decided that having 3″ x 3″ squares would work well with both the larger and smaller MDF tiles. I needed to have a properly-sized template for the Aztec roller such that I could center it on the sculpted tiles. I planned to do 6 large tiles with the roller imprint, 4 without, and 9 small tiles without the roller imprint, and one with it. The roller imprint would be approximately 3″ x 5.5″.
Designing the larger (1′ x 1′) tile with the roller imprint centered.
It was now time to, well, get all messy and sticky with DAS and PVA. I used a smooth pastry roller (my own thank you not my wife’s), and a carpenter’s square (also mine!) to smooth out the DAS/PVA as well as to score lines in the mix at 3″ intervals. I used separate plastic tubs to mix the DAS/PVA and to clean my tools.
A tile without an imprint.This shows how I sculpted the tile surfaces for the roller. The DAS/PVA mix is on top – and I used a roller and wet fingers to smooth the top. Then I marked off 3″ squares and drew the edge of the carpenter’s square across as a tool. If there was to be an imprint, I placed and traced the template as you see here. Then, I would use the Aztec roller to make the imprint.An example of the rolled imprint. It was not always perfect, but I was able to smooth out the edges as best as I could. I expected to be able to make them work – and in the end they did. This was the worst example – I got better over time. In any case, when I was dry brushing I was able to make all look pretty good (though you can be the final judge).
The roller worked fairly well, though there was a learning curve to be sure. I definitely needed to have a tub of water, a brush, and microfiber towels to clean it (and my tools) constantly. The DAS/PVA on the MDF was left to dry over 24 hours. On a few of the larger tiles, I was surprised to see some of the MDF had a bit of warp from the drying clay/glue combo. The smaller pieces had none. Lesson learned. Certainly, finding enough flat surface for all 15 square feet to dry was not easy. I ended up using multiple card tables in the cellar. Yes, the wife was annoyed again. This whole process used up three packs of DAS – that’s 3 kilograms/6.6 pounds – of the stuff.
Drying tiles.
Once they had dried, the next question was how to paint them? I decided to use up my cans of Army Painter Strong Tone and Soft Tone (the dip), as they would be otherwise gathering dust in my paint shed. They theoretically would provide a bit of protection as well. Again, I also needed 24 hours of drying after application – yet again.
The Army Painter “dip” drying.After the dip dried. I was happy with the way the pavements looked, except for the glossy effect.
Normally, I do not use spray varnishes, but these large pieces were good candidates for a spray of Krylon matte varnish. It was warm outside, so I gave them a coat. All went well – until some of the pieces – mainly one – started bubbling up like a cheese pizza. AHHHHH!
From what I could figure out, that was caused by the aerosolized solvent in the can vaporizing in the DAS and trying to release through the varnish and the dip surface. Luckily it was only on one large tile, but that tile took a rework and made this last at least a week or two longer as I tried to find the right combination to recreate a similar color. This took me into mid-July.
More drying time needed! Hell, drying SPACE. 15 square feet to go on a 24 square foot mat is a lot!
I then brush varnished and shaded all of the tiles. At this time I moved on to dry brushing the imprints with Citadel “Astorath Red”. I also darkened the edges with DecoArt “Raw Umber”. The tiles line up together on the lines nicely. Though some warp is visible, it is not horrible. I also went over all of the tiles and shaded them as needed so that the colors were similar and no untouched DAS/PVA was visible.
A comparison of the imprints before and after on the pavement tiles.All six tiles with imprints.Close up shot of a completed tile.An imprinted tile with some Aztec warriors for comparison.
Of course, when you see the completed cityscape, you will be able to better judge how all of these came out. As they are modular, I should be able to use them in many ways. They certainly meet the Aztec criteria of symmetry. Also, these all can be part of Dave’s Season of Scenery Challenge!
At this point in the project, I noticed how the edges of the tiles were a distraction and needed some attention. I thought that seeing bare 90 degree edges and MDF sides coming out of a lake (or swamp) was a less than aesthetically correct situation for my cityscape. People would have built the city up from the lake – and that would have involved reclaiming the lake as dry ground. How? Well, I am sure that the Aztecs would have used slave labor to haul and deposit tons upon tons of rocks on the water’s edge.
My fix was to build some revetments around the cityscape’s edge plus some lily pads, and cattails – which will be the next installment in this series!
I hope that you enjoyed this part 2 and that you stay tuned for the rest – let me know your thoughts in the comments section and I appreciate your giving this a read!
For all of my previous posts on games, units, and other projects for my 16th Century Spanish Conquest supplement for Feudal Patrol™ – “Civilizations Collide” – please see this page.
PAINTS, INKS, GLAZES, SHADES, WASHES, PIGMENTS, FLOCKING, GLUES AND MORE THAT I USED ON THESE TERRAIN PIECES/MODELS:
I have been working through July to build a representative 6′ x 4′ cityscape gaming table that would evoke the flavor of the city of Tenochtitlan, which was the capital of the Aztec Empire. On the arrival of Hernan Cortes in 1519, Tenochtitlan was populated by an estimated 200,000 to 400,000 people – making it even larger than contemporary London. It was built on an island in Lake Texcoco, and was linked to the mainland by multiple causeways. These causeways also had removable or liftable bridge sections. In effect, Lake Texcoco formed a “moat” around the city, making it impregnable to enemies for hundreds of years (until the Spanish Conquest occurred anyways). The causeways would be of major importance during all phases of the Spanish Conquest. Cortes met Montezuma II on a causeway for the first time. The Spanish and their Tlaxcalan allies would fight desperately at different times to both escape Tenochtitlan (La Noche Triste) and to return to conquer it afterwards. The nature and importance of the causeways were major aspects of these battles, so any representation of the city of Tenochtitlan needed to have causeways.
A 1524 map of Tenochtitlan showing the causeways (from History Today).Detail of a Tenochtitlan causeway (from Learnodo Newtonic).Cortes meets Montezuma on a causeway for the first time (from Pinterest).A painting of Cortes at the Battle of Tenochtitlan (from Britannica).
To build a city of such size would be massive – and certainly beyond the scope of a reasonably-sized gaming table. My goals were to make something special – while ensuring that it was something that could be used in games of Buck Surdu’s Feudal Patrol™ in Mesoamerica (using my Civilizations Collide supplement). I wanted a diorama that could be played on. To that end, I have built many buildings and figures that have been previously shared in this blog. What I needed to add was the underlying structure of the city – “the cityscape”.
The work that I did to build and paint this cityscape was extensive and would overwhelm a single blog post. Hell, it almost overwhelmed me just building it! Therefore, I have decided to break my work on it into 5 posts that I will share over the next few days. There will be a lot of WIP shots on each category, leading up to a final reveal. I am also continuing with my weekly garage+ build posts (like here and here), and I have some golf stuff to add as well. This is “Life, Golf, Miniatures, & Other Distractions” after all! My blogging drought is coming to an end! As for the cityscape posts, here is the listing of what is on deck:
Building an Aztec Cityscape – Part 1: Causeways, Lifting Piers, and Removable Bridge Sections (this post)
Building an Aztec Cityscape – Part 2: Pavements
Building an Aztec Cityscape – Part 3: Revetments, Lily Pads, and Cattails
Building an Aztec Cityscape – Part 4: Cortes’ War Wagons
Building an Aztec Cityscape – Part 5: Tenochtitlan – THE FINAL REVEAL
To build the cityscape, I started off with building the causeways, but work on all of these components overlapped. Please enjoy them and hopefully this is useful for my fellow gamers, modelers, and hobbyists. Luckily, these all can be part of Dave’s Season of Scenery Challenge – which is fun as well.
Initially, I wanted to plan the cityscape layout for a 6′ x4′ mat. I drew a rough sketch, and decided that I would get two 2′ x 4′ sheets of 1/4″ MDF from Home Depot. My friend Jeff Smith (a fantastic woodworker) has a lot of tools – to include a nice table saw, which I do not have. As I needed more precise cuts than I could achieve with my Black and Decker skilsaw, I enlisted his help. He was able to cut all the pieces in no time at all (and again, thanks Jeff!!!).
My initial rough concept of how to use the MDF sheets. They would be the basis of all of the cityscape construction. The pavements and causeways are both planned here, as well as where I wanted it all to go.Jeff cutting some causeways.
After the MDF was all cut, I laid out the pieces that I had on my FLG swamp mat, and arranged my buildings. Later, I would get a water mat from them, as I thought the swamp would not work as well. After the MDF concept layout, I was on to the building of the six causeways. I usually went through the process of doing one phase of work on one piece (like a prototype), and if that worked, moving on to the rest in similar phases.
My initial concept laid out on a swamp mat.
My causeway section prototype would be 5″ wide and a foot long. I spaced out some 6″ craft sticks evenly across the bottom and used wood glue to affix them. These would be to support the wooden piers and stones around them on the sides of the top surface. This worked ok, so I did all six with the cross-glued craft sticks.
Lining up the craft sticks on the bottom of the first causeway. At the top you can see some wood I was planning to use as piers – more on those shortly.After I glued all the craft sticks across the bottoms, I weighted them down and let the glue set overnight.
While the glue was setting on phase I of the causeway undersides, I built the two removable bridge sections. These are 6″ long and the same width as the causeways. These would be analogous to a medieval drawbridge. I broke up craft sticks irregularly and dry-fitted them to the top of the bridge sections. Then, I weathered the wood by beating a small chain on and into them with a ball peen hammer. After this, I glued them on with wood glue and let dry overnight. I did not press these with weight as I wanted a less uniform surface of the bridge to represent wear and aging.
My chain and ball peen hammer weathering of the craft stick wood surface.The weathered wood ready for gluing.
Then, I went back to the causeways. The cross-sections were ok, but I needed to have a way to add the revetments along the sides – so I added more craft sticks longitudinally on each side. They would jut out about 1/2″ on the side of the causeways.
Here you see four of the six causeways after the first gluing – and before adding more on the sides for the rocky revetments.Here are the longitudinally-added craft sticks set with binder clips for overnight drying.
Once dry, I covered the surfaces with glue and then chinchilla dust.
After adding the chinchilla dust and allowing for drying. Next up would be the painting and shading of the causeways’ surfaces, then onto adding the piers and rocks.
I finished painting the removable bridge sections and build and painted 4 lifting piers out of square dowels and 1/8″ plywood.
The masked causeways ready for painting, along with the 4 lifting piers and the 2 removable bridge sections. I masked the sides as I wanted to have a clean gluing surface for the piers and rocks. Having an airbrush sped this process – especially relative to all of the gluing!I base coated the causeways, lifting piers, and removable bridge sections (ignore the WIP pavements behind – that’s a sneak peek at the next post!)All painted and shaded – except I wanted to add a bit more to the bridge sections……which you see here – I added some contrast to the planks.
Next, I moved on to the side piers and causeway revetments. The following day I grabbed a dry oak branch from the woods behind the house and cut it up. As each causeway section would need 14 wooden piers (seven per side), I figured I’d need 84 piers. So, I initially planned on using some birch wood discs I had plus the oak sections. I cut up the wood in sizes I thought would work well. However, as I laid it out (dry fit), I was not happy with the appearance. At all. Clearly, compared to a 28mm figure, the wood size was far in excess of what would have been used as piers along the causeways.
The oak and birch wood pier candidates
Laid out, I saw that these were not the right size or appearance. The finished surfaces of the causeways that you see here were ok though.
It was time to regroup. For piers, I then decided to use 1/8″ wooden dowels instead. I cut them up roughly to represent timber and glued them together in threes – and if you are doing the math, yes, that is cutting up and gluing together 252 pieces for the 84 piers. This project had a LOT of gluing and drying stages! I also found a nice source of rocks at Michaels – those little filler stones that some people use in glass vases. These were much cheaper than any hobby talus would have been. The time downside was that for effective placement I needed to glue one course of rocks at at a time – one rock at a time – with PVA – more gluing and waiting for drying…
Detail of the pier and rocks gluing. I cut the pier wood pieces irregularly as possible to add realism.The first side of a causeway glued up with piers and rocks and a 28mm Conquistador for comparison. The PVA would dry and “suck” up nicely into the crevices.
I then painted the piers and added some shade to them.
Painted piers
For the rocks, I painted them with Vallejo “Grey Surface Primer, followed by a layer of Reaper “MSP Black Primer” on the bottom (where the rocks would have been by the lake), and added some slime to them there as well. After that, I added an aggressive layer of shading with Citadel “Nuln Oil”. The effect on the rocks was excellent. You can see a list of all the paints and other materials that I used at the end of this post.
Adding black primer to the bottom of the rocks over the grey primer in an irregular pattern to represent the water line.After adding grey and black primers to the rocks.Finished causeway with the Conquistador. Note the effect of the shading on the rocks.Top viewA finished causeway, lifting piers, and removable bridge section on my new FLG water mat.Tlaxcalans assault the city from the causeway (another sneak peek!)
With the causeways, removable bridge sections, and lifting piers, I now have terrain components that I can use for the cityscape. I also could use them for a causeway battle, and add war canoes in the lake with Aztecs shooting bows, slings, and atlatl at the Conquistadors and Tlaxcalans from the water.
I think you can see why I am breaking up this into multiple posts! This started in June and ended in July. My next post will focus on the design and building of the cityscape pavements. I hope you found this useful and will keep following this series – and please let me know your thoughts in the comments section.
Thanks so much for looking!
For all of my previous posts on games, units, and other projects for my 16th Century Spanish Conquest supplement for Feudal Patrol™ – “Civilizations Collide” – please see this page.
PAINTS, INKS, GLAZES, SHADES, WASHES, PIGMENTS, FLOCKING, GLUES AND MORE THAT I USED ON THESE TERRAIN PIECES/MODELS:
This week on the Garage+ project saw the installation of the concrete footer and the walls – as well as inspection of the foundation. The RJH Concrete crews, under Andy Cormier Homebuilding, did a great job and worked fast on a few warmer July days. The photos below tell the tale.
The concrete crew arrived early on Monday, July 26th.They got to work quickly to place forms for the footer.Footer placed – an earthen excavation wall collapsed on the right but that was no problem. Note how sandy our soil is!Footer view from the second floor of our house.By Monday afternoon, the crew stripped the footer forms.On Tuesday, July 27th, the wall forms were delivered and assembled on the footer.Crew assembling the forms.By Tuesday mid-day, two concrete trucks arrived and the placement of the concrete began. One of the two delivery trucks – because of our underground leach fields, the trucks had to deliver with every extension possible to get to the back walls.Extensions in action.Some of the concrete finished work on Tuesday.It was a hot day, but the crew worked hard and fast.Finishing work proceeds on the concrete walls.On Wednesday, July 28th, the forms on the walls were stripped to reveal this!Same view as above but a different angle.On Friday, the foundation was inspected and passed!
This upcoming week promises to be full of activity as well. Stay tuned!